Critical Path Analysis And Other Project Network Techniques Keith G. Lockyer

ISBN: 9780273034162

Published: July 1st 1991

Paperback

256 pages


Description

Critical Path Analysis And Other Project Network Techniques  by  Keith G. Lockyer

Critical Path Analysis And Other Project Network Techniques by Keith G. Lockyer
July 1st 1991 | Paperback | PDF, EPUB, FB2, DjVu, audiobook, mp3, ZIP | 256 pages | ISBN: 9780273034162 | 9.40 Mb

This text is intended for those who wish to assess the value of project network techniques (PNT) in dealing with their own problems and for those who wish to put the technique into practice. This revised edition discusses resource analysis andMoreThis text is intended for those who wish to assess the value of project network techniques (PNT) in dealing with their own problems and for those who wish to put the technique into practice. This revised edition discusses resource analysis and contains a chapter on practical considerations which has been prepared setting out day-to-day practice which the authors have found useful.

In addition the chapter on control of cash has been amplified and the line of balance chapter now includes discussion of the elemental trend analysis technique. The Solutions Manual has been converted into a lecturers manual whose purpose is to help tutors by reducing the time taken in the drawing of networks. The manual contains A4-size drawings of the key diagrams in the text and all the answers to the quesitons.



Enter the sum





Related Archive Books



Related Books


Comments

Comments for "Critical Path Analysis And Other Project Network Techniques":


vercors-bien-etre.com

©2013-2015 | DMCA | Contact us